The Fingerless Mitts class had 4 students. It's my first time teaching this class so I'm not sure I have the timing correct. In the first session I planned to cast on and knit 4 inches of cuff and to at least halfway through the thumb gusset. One student finished her whole mitt, one got to about where I figured we'd be, one was just behind her, and the fourth one had about an inch done on the cuff. So maybe I need to reconsider the time frame plan for this class.
As usual, I knit along with my students. I ended behind too, but I would expect that since I'm helping everyone out. The mitt so far:
Don't worry, I don't have the students knitting with fuzzy yarn. They are all using Noro Kureyon type yarn, as they should.
The Teal cardigan progresses. I have 6.5 inches left of the body.
It feels like it's taking an eternity to knit. I have to keep reminding myself I'm knitting 3 parts at once-both fronts and the back. All I'll have left after I'm done with this is a couple sleeves. ;-)
Live long and prosper. \\//
5 down, 25 to go.
No comments:
Post a Comment